An expansion for Roxby Downs needed investigation with a pre-feasibility study undertaken over a six month period. 

Tonkin Consulting was engaged by Arup as a subconsultant with responsibilities for all issues relating to water supply, wastewater collection, treatment and re-use and stormwater management within the township.

The project was delivered in three phases which consisted of development of a base case scenario, development and assessment of options and development of a preferred option to enable a cost estimate to be developed.

Part of the project identified the need for the pump station that supplies water to Roxby Downs to be upgraded. The existing pump station provided a variable flow at constant pressure to a distribution network. Hydraulic modelling and development options indicated that with the growth of the Roxby Downs township, a new one would be required. 

Project Summary

Client

Arup

Location

Roxby Downs, South Australia

Completed

2009

Sign up for our newsletter

Be the first to hear about new and emerging projects

×